Priority Experiments
Prioritize apparatus closure for clocks, muons and high-γ charge fields; S301 awaits data. Experimental priorities are distinct from theoretical P0 tasks.
Registry and comparison planning; no new canonical physical result or closed quantitative discriminator.
Directional atomic-clock response
Research this claimNEEDS THEORY · Needs theoryUnknown: transition, reference-clock and transfer responses must be derived independently; geometry alone is not a frequency shift.
First reviewable deliverable: A fixed transition/link response and correlated uncertainty budget.
Open workbenchMuon survival and counts under LVE
Research this claimNEEDS THEORY · Needs theoryChapter 1 Eqs. (1.45)–(1.46) give the illustrative path L=643√999 m≈20323.3 m from approximate inputs. Survival still requires an independently specified decay law, production and energy spectra, propagation and detector acceptance.
First reviewable deliverable: Define L′ statistically, derive an ASD decay law and curate acceptance-qualified data.
Open workbenchHigh-γ charge-field detector readout
Research this claimNEEDS THEORY · Needs theoryHigh-speed source field, laboratory mapping and crystal response are not jointly closed.
First reviewable deliverable: Reproduce the standard source–probe signal, then supply an independent ASD field.
Open workbench01Three acceptance chains
| Project | Calculation chain | Gate to quantitative discrimination |
|---|---|---|
| P1 directional clocks | Spatial construction → transition/reference → transfer → ratio | Independent amplitude/phase, species dependence, covariance and calibration |
| P2 muons | Production → energy loss/path → decay → acceptance → counts | Statistical definition of L′, ASD hazard, shared spectrum and detector selection |
| P3 high-γ charge field | Source → laboratory coordinates → bunch/boundaries → EO response → signal | General source field, crystal response, raw signal and error propagation |
P1/P2/P3 here specify experimental sequencing. P0/P1/P2 on open problems describe research importance. These are separate axes. Workbench example curves support comparison recalculation; they do not mark a priority project complete.
02Data gates and common deliverables
S301 is outside the top three. Even after epochs, covariance and reference frame are available, the present gravity construction must be checked for a genuinely nonzero difference.
Deliver a fixed protocol, source snapshot, Equation IDs, inputs, code, expected output, figure, software version, checksums and explicit failure criteria. Track the first closed discriminator through OP-EXP-001. A zero difference is also a reviewable result.
Position within the framework
These links index inputs and research relationships. The completion status of each derivation is specified in its text. Untranslated supporting pages open in Chinese.
Revision history
Existing canonical module snapshots / 现有正式模块快照 · Predictions & Falsification v1.0 · review 2026-09-22
Download source and scope manifest
Based on versioned canonical modules and cited instrument literature. This experimental program adds operational templates, not new canonical field equations.
Knowledge scopeASD: Priority Experiments. ASD-EXP-TESTS-PRIORITY-EXPERIMENTS-EN. Version 1.0.0; 2026-09-22. https://asd-physics.org/en/tests/priority-experiments. Predictions & Falsification v1.0 · review 2026-09-22. Source EXP-7ca61744dcd2.
Continue with the assumptions, equations and sources.
These links carry this page and its source version into the research workspace. Each request pins its knowledge snapshot. Model availability is shown in the workspace; retrieval and private export remain available.